AIRA emblemAll India Robotics Association (AIRA)
RESEARCH & WHITE PAPERS

Robotics adoption in Indian MSMEs

AIRA editorial discussion draft · For technical and institutional consultation, not a formally approved policy or peer-reviewed publication.

Industrial welding robot at work
Original AIRA discussion draft · November 2026 · Not an approved institutional publication or peer-reviewed paper.

Executive summary

India’s manufacturers need adoption pathways that account for integration, maintenance and operator readiness.

Problem and context

Establish a baseline of throughput, defects, safety incidents and changeover time; identify bottlenecks before selecting technology.

Recommended approach

Create technology-neutral use-case briefs, pilot on representative lines, measure uptime and quality, and evaluate total lifecycle cost.

Measurement and accountability

Track pilot-to-deployment conversion, downtime, defect rate and worker retraining; publish anonymized results.

Implementation priorities

Convene a multidisciplinary working group, validate assumptions with stakeholders, select a limited pilot, establish a baseline, and publish evidence with limitations before scaling. Assign program ownership and independent review.

Evidence reference

IFR adoption statistics and MeitY draft strategy ↗

Download discussion draft
DISCUSSION DRAFT

Detailed implementation framework

Define the business and technical baseline

Document cycle times, defects, staffing, stoppages, product variants and existing machine interfaces. Identify processes where automation can improve outcomes without introducing unacceptable safety or operating risks.

Compare alternatives

A fixed automation fixture, cobot, vision system or manually assisted process may outperform a full robotic cell. Evaluate expected throughput, maintenance, training, service life and total cost against the baseline.

Pilot and procurement

Define acceptance tests, responsibilities, operator training, downtime arrangements, maintenance and spare parts. Procurement should assess lifetime value and reliability rather than only the initial price.

Scale responsibly

Record verified changes in yield, safety, throughput and uptime. Use pilot evidence to decide whether to expand, modify or stop. Share anonymized lessons where permitted.

Contribute to the knowledge ecosystem.

Share technical evidence, field experience and research insights through AIRA’s participation pathways.

Find your pathway →